2003 |
Drainage, expansion of taxiing field and repair of the old aircraft parking area pavement of Zakynthos state airport (ELIKA S.A.) |
1993 |
Additional operational facilities of Chrissoupolis airport (ΚΑΒ – 15Ν) (TECHNODOMI S.A.) |
1990 |
Geotechnical design of the runway of Andravida airport (HELLENIC AIR FORCE) |
1980 |
Geotechnical study of the strength of the runway of Agxialos airport (HELLENIC AIR FORCE) |
1979 |
Geotechnical investigation and pavement design of Lemnos airport (HELLENIC AIR FORCE) |
1979 |
Geotechnical investigation of the taxiing strip and the runway of Chrissoupolis airport (HELLENIC AIR FORCE) |
1977 |
Strength evaluation of the taxiing strip of Larissa airport (HELLENIC AIR FORCE) |
1974 |
Calculation of pavement thickness of the “Olympic Airways” parking area at the Hellinikon airport in Athens (HELLINIKI TECHNIKI S.A.) |
1973 |
Geotechnical investigation of the Syros airport (A.D.K.) |
1972 |
Geotechnical study of the strength of the runway of Andravida airport (HELLENIC AIR FORCE) |
1972 |
Geotechnical consulting during the construction of roads in the Hellinikon airport in Athens (HELLINIKI TECHNIKI S.A.) |
1972 |
Geotechnical study of the strength of the subsoil and the pavements of Lemnos airport (HELLENIC AIR FORCE) |
1972 |
Geotechnical study of the strength of the subsoil and the pavements of Souda airport (HELLENIC AIR FORCE) |
1971 |
Geotechnical study of the strength of the pavements of Tympaki airport (HELLENIC AIR FORCE) |
1971 |
Extension of the runway of the Kerkyra airport inside the Chalikiopoulos Lake (J/V YDREM Ltd. – CHRISTOPOULOS) |
1970 |
Supplementary geotechnical stability analysis the Samos airport embankment (X.E.K.T.E. S.A.) |
1969 |
Geotechnical study for the strengthening of the pavement of Micra Thessaloniki airport (HELLENIC AIR FORCE) |
1968 |
Geotechnical investigation of reconstructed and expanded runways 09 – 27 και 13 – 31 of Heraklion airport (E.T.E. S.A.) |