QUALITY CONTROL AND CONSULTING SERVICES DURING DAM CONSTRUCTION
2011- | ASOPOS dam in Korinthia (MINISTRY OF AGRICULTURE) |
2007- | SXOINA dam in Karpathos Island (MINISTRY OF AGRICULTURE) |
2007- | LITHEOS dam in Trikala (PREFECTURE OF TRIKALA) |
2007-10 | SARAPIO dam in Chios Island (PREFECTURE OF CHIOS) |
2005-08 | KALAMOTI dam in Chios Island (PREFECTURE OF CHIOS) |
2004-07 | KOMARA dam in Evros (PERIPHERY OF EASTERN MACEDONIA AND THRACE) |
2000-03 | STENO dam in Serifos Island (MINISTRY OF AGRICULTURE),VIDEO |
2000-01 | GRATINI dam in Rodopi (PUBLIC POWER CORPORATION S.A.) |
1997-01 | PLATANOBRISSI NESTOS dam in Drama (PUBLIC POWER CORPORATION S.A.) |
1995-00 | ARTZAN-AMATOVO pond in Kilkis (MINISTRY OF AGRICULTURE) |
1993-95 | DOXA dam in Korinthia (MINISTRY OF AGRICULTURE) |
1993-94 | ZYFIA dam in Chios Island (MINISTRY OF AGRICULTURE) |
1990-93 | MESOCHORA dam in Trikala (PUBLIC POWER CORPORATION S.A.) |
1985-91 | LEFKOGIA dam in Drama (MINISTRY OF AGRICULTURE) |
1983-85 | SFIKIA dam in Imathia (PUBLIC POWER CORPORATION S.A.) |
1980-83 | ASOMATA dam in Imathia (PUBLIC POWER CORPORATION S.A.) |
QUALITY CONTROL AND CONSULTING SERVICES DURING ROAD CONSTRUCTION
1979 | HANAQUIN – IRANIAN BORDERS motorway in Iraq (HELLINIKI TECHNIKI S.A.) |
1969 | Official quality control laboratory of the road projects of the Municipality of Athens (MUNICIPALITY OF ATHENS) |
QUALITY CONTROL AND CONSULTING SERVICES DURING TUNNEL CONSTRUCTION
1990-93 | Drainage and grouting tunnels of Mesochora Hydroelectric Power Plant in Trikala (PUBLIC POWER CORPORATION S.A.) |
1990-93 | Plakaries tunnel of the access road to the Hydroelectric Power Plant of Mesochora in Trikala (length: 570 m) (PUBLIC POWER CORPORATION S.A.) |
1990-93 | Skorliga tunnel of the national road Trikala – Arta (length: 1245 m) (PUBLIC POWER CORPORATION S.A.) |
1990-93 | Prionia tunnel of the national road Trikala – Arta (length: 550 m) (PUBLIC POWER CORPORATION S.A.) |
1986 | Diversion tunnel of the Lefkogia dam in Drama (MINISTRY OF AGRICULTURE) |
1983-85 | No 2 weir tunnel, headrace tunnel and bottom outlet of Sfikia Hydroelectric Power Plant in Imathia (total length: 1230 m) (PUBLIC POWER CORPORATION S.A.) |
1980-83 | Headrace and outlet tunnels and underground plant of Asomata Hydroelectric Power Plant in Imathia (total length: 650 m) (PUBLIC POWER CORPORATION S.A.) |